Showing all 9 results
Installed high: 25,5 mm Valve lift: 11,0mm Hardness kp: 80
Installed high: 30 mm Valve lift: 11,0mm Hardness kp: 94
Duration: 260° Peak timing: 112° Valve lift: 9,9 Lift at TDC: 0,5 Valve timing: 18/62 – 62/18 Valve clearence: — Slot for vacuum pump: 4.2mm
Duration: 272° Peak timing: 110° Valve lift: 10,4 Lift at TDC: 0,9 Valve timing: 24/68 – 68/24 Valve clearence: hydro
Duration: 272° Peak timing: 112 Valve lift: 9,8 Lift at TDC: 0,7 Valve timing: 24/68 – 68/24 Valve clearence: —
Duration: 280 ° Peak timing: 112 Valve lift: 10,5 Lift at TDC: 0,8 Valve timing: 28/72 – 72/28 Valve clearence: —
Duration: 260°/242° Peak timing: 112° Valve lift: 9,8/9,4 Lift at TDC: 0,5 Valve timing: 18/62 – 53/9 Valve clearence: —